Quarterly Equipment
Maintenance Report
Quarterly Equipment Maintenance Report
Central Authority of Safety — Facilities Department
This report documents routine inspection, servicing and replacement of facility equipment conducted during the second quarter of 2024.
Maintenance activities were conducted in accordance with Central Authority of Safety Facilities Maintenance Procedure FM-04 and applicable departmental schedules.
No major equipment failures were reported during the reporting period.
| Category | Scheduled | Completed | Outstanding | Status |
|---|---|---|---|---|
| Electrical Systems | 34 | 34 | 0 | Complete |
| HVAC Systems | 18 | 17 | 1 | Follow-up Required |
| Water Systems | 22 | 22 | 0 | Complete |
| Security Systems | 11 | 11 | 0 | Complete |
| General Equipment | 46 | 46 | 0 | Complete |
| Asset ID | Equipment | Location | Work Performed | Result |
|---|---|---|---|---|
| FAC-EL-044 | Main electrical distribution panel | Central Admin — Level 1 | Inspection, thermal scan and connection tightening. | Serviceable. |
| FAC-HV-019 | HVAC circulation unit | Central Admin — Level 3 | Filter replacement and belt inspection. | Serviceable. |
| FAC-WT-007 | Building water filtration system | Central Admin — Basement | Filter replacement and pressure testing. | Serviceable. |
| FAC-GE-102 | Industrial freezer unit | Storage Area B | Temperature calibration and seal replacement. | Serviceable. |
| FAC-GE-118 | Portable generator | Emergency Storage | Oil replacement, battery inspection and test run. | Serviceable. |
| FAC-GE-121 | Floor maintenance machine | Janitorial Storage | Routine cleaning and drive belt replacement. | Serviceable. |
The following items were identified during routine inventory reconciliation. Items have been retained pending confirmation of departmental ownership or disposal requirements.
Several non-standard inventory items were found in Storage Areas B and C during the June inventory cycle.
Facilities staff were unable to identify the requesting department for these materials. No corresponding purchase orders were found in the current procurement database.
| Action | Responsible Unit | Due Date | Status |
|---|---|---|---|
| Identify owner of non-standard inventory | Facilities | 31/07/2024 | Pending |
| Confirm disposal requirements for surplus materials | Procurement | 31/07/2024 | Pending |
| Confirm location of Room C-02-17 | Facilities / Records | 15/08/2024 | Pending |
Routine maintenance activities for the second quarter of 2024 were completed satisfactorily.
No significant equipment failures were recorded. Outstanding maintenance activity is limited to one HVAC circulation unit awaiting replacement components.
Non-standard inventory remains under review.
|
Prepared By
Facilities Maintenance Unit
|
Reviewed By
D. MercerFacilities Supervisor |
Approved
11/07/2024
|